CS-C10Home / Origin network / MOQ and lead time

MOQ and lead time: ranges, calendars and the written offer

Every MOQ and every lead time on this site is a typical reference range, not a quote. The numbers move with the depth of customization, the season and the format - and the only binding figure is the one in your written offer. This page explains the ranges, the calendar behind them, and how to read both.

Planning board with tea production schedule, sample calendar and MOQ reference sheets at a sourcing desk Illustration

MOQ follows the depth of customization

There is no single tea MOQ; there is a ladder, and the rung depends on how much of the program is yours. Selling the desk's standard bulk lot asks the least. Printing your brand on the pack asks for more. Filling your tea into pyramid bags asks for a line slot. Wrapping it in a custom gift box asks for tooling. The table shows the standing reference ranges; each is an industry-habit band, confirmed in writing per program, and within a band the exact figure follows the line, the grade and the season.

Depth of customizationTypical programMOQ reference range
Bulk, standard specBlending, foodservice, repacking50-100 kg per line
Private label, packedOwn-brand pouches, tinsAbout 100-300 kg or 5,000-20,000 bags per item
Pyramid bag fillingHotel, cafe and DTC bag programs100,000-bag scale
Custom gift boxesCorporate and seasonal gifting500-1,000 boxes
Tea setsBundled gift and retail programs300-500 sets
Empty pyramid bagsBuyers with their own filling line100,000+ bags

Lead times: samples, stock and custom work

Lead time divides into three clocks that buyers often merge into one. The sample clock is shortest: in-stock teas ship as samples in 3-7 working days, while custom blend samples need 7-15 because they are built and cupped before they travel. The stock clock covers standard-spec bulk of teas already in the pipeline: 10-15 working days from confirmed order to packed goods. The custom clock covers everything with your name on it - private label packing runs 20-35 days, and new blend development or new packaging molds run 35-60. When a deadline is tight, the honest question is which clock the program is really on. A launch that must ship in three weeks is a stock-clock launch with private label added later, or it slips; the desk would rather have that conversation at the brief than at the deposit.

The spring harvest calendar

Most tea is picked between spring and autumn, but the calendar bites hardest in green tea. Pre-Ming (pre-Qingming) Longjing is picked before early April, and the lots that define the grade are sold within weeks of the fires cooling. White teas concentrate in spring too. Oolongs run a spring and an autumn season, with rock oolongs reaching market after summer roasting. Pu-erh and herbal lines move year-round. For a buyer this sets a hard planning rule: spring-harvest programs are decided backwards from the harvest window, not forwards from the purchase order. The sequence looks like this - brief and sample plan in late winter, samples cupped as new-season lots land, bulk decision within the window, shipment booked while the stock is fresh. Miss the window and the program waits a year or buys held-over stock at a different quality level. Spring harvest timing covers the buyer-side mechanics, and the broader tea seasonality calendar maps every category's window.

Why ranges, not numbers

A fixed MOQ published on a website goes stale for the same reason a fixed price does: harvest outturn moves, film and tin orders have their own minimums, and a line in short supply carries a different minimum than the same line in a heavy season. So the desk quotes ranges, then binds them in writing per program - the range sets expectations, the written offer sets the deal. The same discipline covers lead times: the 20-35 day private label reference assumes artwork approved on schedule and certificates in place, and the offer states what happens to the clock if either slips. Buyers coming from other categories sometimes read ranges as softness; in tea they are the honest form, and the private label MOQ note explains what actually moves a figure inside its band.

Reading the written offer

An offer from the desk is a short document and every line in it matters. It names the line and grade with the lot reference, states the MOQ as a binding figure, quotes validity against the current market, lists the packing format and its lead time, and attaches or references the sample result the offer is based on. Deposits, balance terms and shipping terms ride on the same page. Read it against your brief and challenge it - an offer you do not fully understand is a spec problem surfacing early, which is exactly when it is cheap to fix. The offer sits at step seven of the program spine described under procurement process, and it inherits every decision made before it.

Planning backwards from your launch date

Put the three clocks and the harvest calendar together and planning becomes arithmetic. Work backwards: the shelf date minus sea transit gives the sail date, the sail date minus production gives the order date, and if the tea is spring-harvest, the order date minus sampling gives the brief date. A European retail launch for pre-Ming green tea is a winter conversation; a foodservice pyramid bag program in a sturdy black tea can start any month. The desk's most useful early reply is often just this calendar, in writing, before any talk of quantities. If you have a date in mind, send it with the brief through the quote form and the desk will return the working-back schedule with the ranges filled in.

Questions buyers ask

Can the MOQ be lower than the stated range?

The ranges exist because packing lines, print runs and bag-filling slots have real minimums. Within a program the desk can sometimes restructure - fewer SKUs, simpler pack, stock lot instead of custom - which lands the total lower than forcing one line under its band.

Does the MOQ apply per tea or per order?

Per item: each line and each packing format carries its own reference. A three-tea private label program is three band figures plus any box or bag orders, not one pooled quantity.

When must a spring green tea order be placed?

Briefs for pre-Ming and early spring lots are best in late winter, with samples cupped as the new lots land and the bulk decision inside the window. Programs that decide after the window buy held-over stock by definition.

What extends a lead time most often?

Late artwork approval, new packaging molds, and certificate work for the destination market. All three are visible at the brief stage, which is why the desk asks for them before the deposit rather than after.

Are the lead time figures business days or calendar days?

Stock and sample figures are working days; the private label and custom-build figures are calendar days. The written offer states which clock applies to each line item of your program.

Send the teas you need, your market and a quantity per item. The desk replies in writing with a sample plan, pack options and the reference MOQ.